Fikry Gomaa Aly Metwally
Lecturer
Workshop / Conference
2 Workshop / Conference
Metwally, F., (2006), (Resource Allocation and Leveling_Based Scheduling of Construction Projects Using Genetic Algorithm.), Proceedings of the Fifth International Engineering Conference (March 27-31, 2006),EL-Mansoura-Sharm EL-Sheikh.
Workshop / Conference
Conference
Place
In university
Start Date
End Date
Year
2006
Elazouni, A., El-Kasaby, S., and Metwally, F., A Decision Support System for Maximizing Contractor Actual Profitability,” Proceedings of the 6th International Conference for Building and Construction (Inter Build 99), Cairo, (1999), pp. 393–405.
Workshop / Conference
Conference
Place
In university
Start Date
End Date
Year
1999
