Vulnerability Assessment of the Egyptian Red Sea Coastal Zones to Climate Change
Date
2025-07-17
In Progress/Completed
Completed
Dynamic Analysis of Steel Composite Lock Gate Structures
Date
2025-04-22
In Progress/Completed
Completed
Investigating the Improvement of Water Circulation and Water Quality of Egyptian Northern Lakes, Case Study Al-Manzala Lake
Date
2025-03-04
In Progress/Completed
Completed
Improving the Navigation through the Nile River Bridges
Date
2024-01-11
In Progress/Completed
Completed
Design of Sedimentation Mitigation Measures in front of Intake Structures Using Hybrid Approach
Date
2021-03-03
In Progress/Completed
Completed
Integrated Water Resources Management of Northern Iraq with Considerations Climate Change Aspects
Date
2021-03-03
In Progress/Completed
Completed
Optimum Design of Pump Intake Using CFD for Improving Hydraulic Performance
Date
2020-12-29
In Progress/Completed
Completed
Modeling Morphodynamic Processes at River Channel Confluences
Date
2020-09-07
In Progress/Completed
Completed
Management and Evaluation of Performance and Environmental Conditions of Nubian Sandstone Aquifer in Darb El Arbeain, Southern Egypt
Date
2020-09-07
In Progress/Completed
Completed
Using Jets to Minimize the Passive Influence of Hydraulic Jump Downstream Hydraulic Structures
Date
2020-09-07
In Progress/Completed
Completed
11.Numerical Study for Scour Around Bridge Piers
Date
2017-03-02
In Progress/Completed
Completed
6.Effect of Barrage Components on Navigation Waterway
Date
2017-03-02
In Progress/Completed
Completed
10.Management and Evaluation of Groundwater Aquifer in the Middle Part of Darb El-Arbaein Area, South Western - Egypt
Date
2017-03-02
In Progress/Completed
Completed
9.Sedimentation Analysis for Aswan High Dam Reservoir
Date
2017-03-02
In Progress/Completed
Completed
8.New Design for Shore Protection Strctures
Date
2017-03-02
In Progress/Completed
Completed
7.The Effect of the Cross Water Currents on Navigational Ships
Date
2017-03-02
In Progress/Completed
Completed
5.Optimum Use of Oriented Spur Dikes to Minimize the Impact of Diversion Channel at the Barrages
Date
2017-03-02
In Progress/Completed
Completed
4.Scour at Bridges Abutments in Cohesive Soil
Date
2017-03-02
In Progress/Completed
Completed
3.Evaluation of Alternative for Lowering Ground Water Table in Urban Areas
Date
2017-03-02
In Progress/Completed
Completed
2.Hydraulic Characteristics of Flow in Pools in Stilling Basins
Date
2017-03-02
In Progress/Completed
Completed
1.Sediment Transport in Approach Channels to Harbors