محمد فائق عبد ربه احمد
أستاذ متفرغ
الخبرات
15 الخبرات-
Design of metal sheets painting shop for Cairo metal work 1979 estimated cost 3 million LE.
-
Design of deep freezers and refrigerators factory at Abo Rawash Giza, Egypt, 1980 estimated cost 7 million LE
-
13) Design of the following pumping station: a- 11.5 m3/sec b-4 m3/sec c- 1.5 m3/sec For El Gezera irrigation project –Iraq, during the period 1984-1988
-
Mechanical measurements course through the Arab training bureau 2008
-
Oil storage tanks design and inspections through the Arab training bureau 2008
-
Pumps maintenance and operation through the Arab training bureau 2006
-
Redesign water pipe line for a pumping station 10 km for the mechanical& electrical authority Ministry of irrigation.2008
-
Course and networking in the field of computers 1993- till now
-
Design a group of multistage centrifugal pumps Using computer modeling CFD for Turkish firm.
-
Air-conditioning system design and software analysis
-
Chillers systems control training course.. Dubai
-
Industrial safety training course Saudi Arabia
-
Diesel engines maintenance training course Saudi Arabia.
-
New technologies in the field of Water desalination , training course, Egypt
-
Quality assurance for the erection of Inshas nuclear reactor.
